Monday, March 15, 2010

This year's projects include

recaulking the stanchions
putting the red stripe back on the transom
adding red to the cabin sides
new antiskid for the cockpit
painting exsiting non-skid a lighter gray
paint cockpit
varnish teak toe rails
make table for interior
clean up electrical board

Spring is here, time for more recoring. The two area below the stern stanchion and padeye were drenched and rotten. This is what happens with poor caulking. After the winter snows there was standing water in the areas near the stern.